Storm Network Structure (0)
| Baffle Box |
| Ditch Block |
| Ditch Point |
| Energy Dissipater |
| Flume |
| Other |
| Pond Point |
| Pump Station |
| Sediment Basin |
| Unknown |
| Vault |
| Wetland Point |
Storm Weir Structure (1)
Storm End Structure (2)
| Backflow Preventer |
| Capped |
| Direct Connection |
| End Wall |
| Flared End |
| Mitered End |
| Open End |
| Other |
| Pipe Boot |
| Sand Bag Cement |
| Seawall |
| Unknown |
Manhole (3)
Inlets (4)
CCTV Pipes (5)
| 2013/2014 Assessment |
| 2013/2014 Assessment; 2015 Assessment, add. scope 01 |
| 2015 Assessment |
| 2015 Assessment - 2016 Assessment |
| 2016 Assessment |
| 2017 Assessment |
Storm Gravity Main (6)
Street Centerlines (7)
County Boundaries (8)
|